Question

A DALI DT1 Function Test simulates a 30-second mains outage to verify that the emergency luminaire switches over to battery; the result (OK / Battery Fault / Lamp Fault) is reported back to the controller for an EN 50172-compliant audit trail.

DALI-2LearnEmergency DT1Hard
Answer

True

The Function Test is the standardised monthly test required by EN 50172: it lasts about 30 s (long enough to verify turn-on), opens the internal mains relay so the battery takes over, and checks that the LED lights up at or above the minimum luminance threshold. Results are stored in MB202 (the Emergency Memory Bank) with date and result code, and are queryable from a central controller. Automation produces a strong ROI, typically saving 80 percent of the manual inspection effort.

Preparation tip

Stagger function tests across the day rather than batching them at midnight — a simultaneous test on 200 luminaires causes a peak battery discharge that masks individual battery weakness.

Waitlist

DALI-2 bank in preparation

The full DALI-2 bank isn't available yet. Drop your email to get notified at launch and grab an early-bird discount.

Join the waitlist
Want more?

See the 9 other DALI-2 practice questions

Related questions

Question from our independent practice bank. DALI-2 is a registered trademark of DALI Alliance, not affiliated with CertifBus.

Last updated: 19 May 2026

Join the waitlist
DALI-2 waitlist