Glossary term
OPERAT
energieBasics
Also known as
Observatoire de la Performance Energétique de la Rénovation et des Actions du Tertiaire
Definition
Digital platform of the French ADEME agency for entities subject to the French tertiary sector energy-saving obligation (Décret Tertiaire, decree no. 2019-771) to report annual energy consumption and track reduction targets. This is a French regulatory tool.
Source
https://operat.ademe.fr/Questions using this term
- In an installation predating 2018, a maximum of 64 sensors, actuators, line couplers and backbone couplers can be connected to a TP main line.2. TP Topology · Offizielle Musterprüfung 4
- The correct operation of a sensor in a KNX installation can be verified by comparing the filter tables.6. ETS Project Design · Offizielle Musterprüfung 4
- On highly sensitive KNX Secure installations (strategic sites, defence buildings), the keyring keys can be stored in a Hardware Security Module (HSM) attached to ETS, guaranteeing that the keys never leave the secure hardware even during download operations.X. KNX Secure · HSM (Hardware Security Module)
- The emergency lighting of a building CANNOT be driven by KNX alone: it must comply with dedicated standards (NF EN 1838, EN 50172) that require a self-contained system with a backup battery.5. Lighting Control · Sicherheitsbeleuchtung
- BACnet relies on an object-oriented model: every device exposes Objects (e.g. Analog Input, Binary Output) that contain Properties (Present_Value, Object_Name, Description, etc.).1. Architecture · Objektorientiertes Modell
Practice now
See how exam-ready you really are
10 real certification questions, no account needed. Find your gaps in under 5 minutes — free.